2026-11-06 ·
Termite Protection Before a Birmingham Addition, Patio or Renovation
Tell the existing provider early
An addition, new patio, excavation or utility repair can affect access and previous termite protection. Give the responsible company the drawings or planned changes before work starts. Ask how the new construction relates to the current agreement and which stages need coordination.
Keep the foundation details clear
A new slab beside a crawl-space building or a porch attached to an existing foundation introduces different inspection points. Ask the builder and pest provider which areas will become inaccessible and how protection and records will be handled before that happens.
Exposed wood creates a different opportunity
Where framing is open, a suitable wood treatment may have a role. That does not mean every piece of timber needs the same product or that a wood application replaces the complete termite plan. Product suitability and actual target organisms matter.
Record completion and later changes
Keep diagrams, application records and the builder’s relevant documentation. Ask what happens if later grading or excavation disturbs completed work. Confirm how inspections or continuing protection begin once construction is finished.
Explore pre-construction termite treatment, borate wood treatment and termite prevention. Call (323) 689-7617 with the property address, plans and construction timing.